Sunday, January 31, 2010

Lenexa Brentwood Stormwater Project - Anthony Hall, P.E.

Anthony Hall, P.E. from CDM, joined the show today to share some of the design and construction insights to the award-winning Brentwood stream restoration project in Lenexa. Find out why they built vertical stream walls, instead of grading the streambanks. Listen to the podcast.

No comments:

Post a Comment